- Inside an Industrial Park
- Near SLEX Exit
- steel structure warehouse
- roof apex approx. 12.2 meters
- elevation 3.2 meters from the road
- cross docking system
- 6 elevated loading/unloading bays
- with Fire Detection and Alarm System
- with Fire Pump, Wet Stand Pipe and Fire Extinguisher
- with 4 level racking system
- with CCTV cameras
- with IT infrastructure system
- with MRF (Material Recovery Facility)
- Built in 2023
Telephone number: View Phone